taktonic
LiDAR point-cloud digital twin of a factory
Platform · DWG TK-0002

The operating system for self-running plants.

Hardware, software and AI built as one stack, so one company answers for the whole chain: from a sensor on a 40-year-old press to the agents that run your schedule.

Book a Plant Scan →
L1MachinesL2DataL3Twin and controlL4ThinkL5ActL6Operate∎Security
L1 · MACHINES

See every machine, move every part.

Seven products that attach to what you run today. No wiring into your controls, no rip-and-replace.

Nerve
NerveM-01

Clamp-on sensors for vibration, current and temperature. Installed in minutes, with no wiring into your controls.

INSTALL · MINUTES PER MACHINE
Rosetta
RosettaM-02

Reads legacy PLCs and machines through drivers and vision taps. Covers 2,300 machine and controller models, many long out of production.

2,300 MODELS COVERED
Core
CoreM-03

An edge AI server that runs models and virtual PLCs inside your plant, with no dependence on the cloud.

ON-SITE · CLOUD-INDEPENDENT
Eye
EyeM-04

Inline vision that inspects and measures at line speed.

INSPECTION AT LINE SPEED
Cells
CellsM-05

Movable robot cells for machine tending, palletizing, kitting and welding. In production 21 days after order.

21 DAYS ORDER → PRODUCTION
FlowM-06

Mobile robots and autonomous forklifts for internal transport.

AMR · AUTONOMOUS FORKLIFTS
GridM-07

Metering, storage and heat recovery, run together with production.

METERING · STORAGE · HEAT RECOVERY
L2 · DATA

One model of your whole plant.

FabricD-01

A unified namespace and industrial knowledge graph for every machine, order and part. Built on ISA-95 and Asset Administration Shell models. Your data exports in open formats, at any time.

ISA-95ASSET ADMINISTRATION SHELLUNIFIED NAMESPACEOPEN EXPORT
plant/monterrey/line/press-2/asset/p07 ├─ state: RUNNING · 14 spm ├─ order: WO-88412 · door inner LH └─ health: bearing B2 · RUL 19 d
L3 · TWIN AND CONTROL

Test before you touch.

OpenUSD digital twin built from LiDAR
MirrorT-01 · OPENUSD

An OpenUSD digital twin built from LiDAR and camera scans. Every change runs here first.

ControlT-02 · IEC 61131-3 / 61499

Virtual PLCs for IEC 61131-3 and IEC 61499 logic. Changes roll out from twin to shadow to canary to fleet, each with one-step rollback.

01Twin
02Shadow
03Canary
04Fleet
← ONE-STEP ROLLBACK AT EVERY STAGENO LINE STOPS
L4 · THINK

Predict, schedule, balance.

LPM-3FOUNDATION MODEL
410MMACHINE-HOURS OF TRAINING DATA

Our process foundation model. It learns from every plant without your raw data leaving your site.

Takt EngineSCHEDULING

Schedules and balances every line, every minute.

TherbligMANUAL WORK

Measures manual work from video for time and ergonomics. It tracks posture and motion, never faces.

L5 · ACT

AI agents with written mandates.

Eight agents act inside limits you approve in writing. Anything outside those limits goes to a person.

AGENT 01SCHEDULE
Plannermay resequence orders within the frozen window
AGENT 02SETPOINTS
Pilotmay adjust setpoints inside validated ranges
AGENT 03MAINTENANCE
Keepermay move planned maintenance ±4 h
AGENT 04QUALITY
Inspectormay tune process to hold tolerance; holds parts on doubt
AGENT 05MATERIAL FLOW
Runnermay dispatch AMRs and re-route internal transport
AGENT 06ENERGY
Stewardmay shift loads to cheaper hours within production plan
AGENT 07SAFETY WATCH
Guardianwatches and alerts; never overrides safety PLCs
AGENT 08RECORDS
Scribewrites batch records and reports; changes nothing
Guardian watches for risk. Certified safety functions always stay hard-wired.
L6 · OPERATE

People in command.

Command center in Munich
CommandO-01 · MUNICH · 24/7

Our Line Pilots watch every connected plant around the clock from Munich, covering every US shift. They can stop any agent in any plant.

Operator using tablet guidance
O-02 · 40 LANGUAGESWayfinder

Voice and AR guidance for operators, in 40 languages.

Experienced machinists' workshop
O-03 · KNOW-HOW CAPTUREHeirloom

Captures how your experts work before they retire, and turns it into guidance for the next shift.

AROUND EVERY LAYER

Security around every layer.

BastionIEC 62443

Zero-trust OT security around the whole stack, built to IEC 62443.

Security on the Trust page →

Start with one layer.

Most plants start with Nerve and Fabric, see their losses in dollars within weeks, then add the layers that pay most.

Book a Plant Scan →